The duration for converting your lower level into an in-law suite can differ considerably, typically ranging from approximately 8 to 20 weeks , but potentially extending longer depending on multiple factors. These include the existing condition of the area , the scope of the renovation (e.g., adding a water closet, cooking area), necessary permitti